12 pages · Business
A free guide published by Academy Engineering, PLLC.
Every building project starts with a question the owner has to answer: what must this building do for us, and how will we know it does? The Owner's Project Requirements, or OPR, is where that answer gets written down. It is the owner's document in the building commissioning process, and it becomes the yardstick that the design, the construction and the final testing are measured against. This free guide explains the OPR in plain English. It covers where the OPR comes from (ASHRAE Standard 202 and ASHRAE Guideline 0), when LEED requires one, how it differs from the Basis of Design, who should write it and when, and how to keep it working from predesign through turnover. It finishes with a section-by-section checklist and a fill-in outline you can start from today.
Free · 12-page PDF · Instant download
Who it's for
- Building owners and developers planning new construction or a major renovation - Facility managers who will operate the building after turnover - Nonprofits, churches, schools and associations whose board or committee must agree on project goals - Small commercial owners pursuing LEED or a commissioned HVAC, lighting or controls project It applies anywhere in the U.S. The standards and LEED requirements it describes are national.
What's inside
- What an OPR is, in one page, with an at-a-glance table: who owns it, when it's written, who accepts it, and why it's never "finished." - When it's required: LEED v4.1 Fundamental Commissioning and Verification and Enhanced Commissioning, and LEED v5 Fundamental Commissioning (EAp3) and Enhanced Commissioning (EAc5). - OPR vs. Basis of Design: a side-by-side table of who writes each, when, in what language, and what each contains. - Who writes it, and when: the people to involve and a phase-by-phase timeline from predesign to occupancy, plus the existing-building equivalent (Current Facility Requirements). - A section-by-section checklist: project basics, goals and benchmarks, occupancy, indoor environment, systems and the envelope, O&M and training, budget and schedule, and commissioning requirements. - Criteria you can verify: how to turn "comfortable" and "efficient" into criteria a commissioning team can test. - A fill-in OPR outline and revision log. - Common mistakes and how to use the OPR through design reviews, submittals, testing, training and the post-occupancy review. - When to bring in help: the difference between a commissioning provider, an owner's representative and the design team.
Frequently asked questions
- What are Owner's Project Requirements (OPR)?
- The OPR is a document, written from the owner's side, that records what a building project must achieve and how the building will be used and operated: goals, measurable performance criteria, budget considerations, success criteria, and training and documentation expectations. It comes from the building commissioning process described in ASHRAE Standard 202 and ASHRAE Guideline 0.
- What is the difference between the OPR and the Basis of Design?
- The OPR states what the owner needs, in plain language. The Basis of Design (BOD) is the design team's technical explanation of how the design meets the OPR: the systems chosen, the assumptions, calculations and codes behind them. The owner owns the OPR; the design team owns the BOD.
- Who writes the OPR?
- The owner and the owner's team, ideally with the commissioning provider involved from the start. Input from operations and maintenance staff, end users and, where possible, the design team makes it stronger. The owner accepts the OPR and each revision.
- When should the OPR be written?
- At the start of the project. The Whole Building Design Guide says it needs to be available no later than predesign, and it is updated as the project evolves. For LEED v4.1 projects, the OPR must be complete before contractor submittals for commissioned systems are approved.
- Does LEED require an OPR?
- Yes. LEED v4.1's Fundamental Commissioning and Verification prerequisite starts with developing the OPR and the BOD, and LEED v5's Fundamental Commissioning prerequisite (EAp3) has the commissioning provider help develop the OPR and review the BOD against it. Enhanced Commissioning builds on that work. Requirements vary by LEED version and rating system.
- Do small projects need an OPR?
- There is no required format, so a small project can use a short OPR that covers the essentials and the owner's acceptance. Even the Department of Defense's guide specification for enclosure commissioning notes a stand-alone OPR may be unnecessary for more typical projects but helpful for large or complex ones.
- Is this guide free?
- Yes. It's a free guide published by Academy Engineering, PLLC. Download the PDF on this page. You're welcome to share it unchanged; please don't sell it or post an edited version.
- Is this engineering advice for my project?
- No. It's general information to help you plan. It doesn't replace the standards themselves, your LEED requirements or advice from your project team.
Need help?
Ask a PE about this guidePlanning a project in Northern Virginia? Our owner's representative service sits on your side of the table, from a goals workshop at the start through design reviews and tracking that commissioning and testing are completed. Questions about this guide can go to contact@academyengineering.com, or see Ask a PE.